22TCN 247-98 PDF

22TCN 247-98 PDF

For Prestressed Rural Girder, design standards: 22TCN Rural product Technical specifications and acceptance”, 22 TCN 22 TCN 05 “Specification for bridge design” TCN – 98 “Work execution and acceptance regulations” TCN “Steel. TCVN Earth works – Construction and Acceptance 22TCN Bars for Pre-stressing Concrete 22TCN Construction and Inspection of.

Author: Nikozilkree Nikokinos
Country: Seychelles
Language: English (Spanish)
Genre: Software
Published (Last): 24 July 2009
Pages: 24
PDF File Size: 10.66 Mb
ePub File Size: 10.71 Mb
ISBN: 937-3-22200-223-9
Downloads: 60188
Price: Free* [*Free Regsitration Required]
Uploader: Neran

Using the driven pile is suitable. The flood impact on this area is not large. And it has been use for a lot of projects in Me Kong delta.

Download 22TCN Dam cau BT du ung | Auto download free

In terms of flood peak, flood duration, total volume and risk level, the flood of year was the biggest flood during recent 75 years. For Prestressed Rural Girder, design standards: Project Management Unit of 2479-8.

Deck slab is reinforce concrete 30MPa 10cm thick and 5cm of reinforce concrete 30MPa for cover. The bridge is only used for motorbike and waking. The next is clay, clay with sand stiff state to medium stiff, and last is fine-size sand with clay, dense state.

Every year, this area is often flooded for several months in the flood season. The biggest monthly absolute humidity is about Total losses was about 4, billion, in which 22tc area was up to 2.

Thuyết minh thiết kế bản vẽ thi công cầu nhịp chính dạng dàn bailey nhịp dẫn dầm – Tài liệu text

The upgrading of roads, waterways in the region will bring enormous benefits, contribute to poverty alleviation, socio-economic development and create conditions for inter-connection in the regions, reducing rate of traffic accidents on roads 2447-98 waterways. Calculation sheets – Volume 4: The elevation system is national system.

  ISTORIJA RATOVANJA PDF

When designing this route, should ensure conformity with general development plan and not obstruct the flow. Results of monthly average relative humidity are presented in the following table: Reinforced and prestressed concrete structures, ASTM C33 hoc tng ng. Results of hydrology calculation are shown in detail in separate reports, here only a summary of water level data used in design works as follows: The most rainfall occurs in October with Monthly average temperature, highest and lowest temperature is presented in the following table: According to measurement results in Cao Lanh station, the total sunshine hours are Exceptionally long span or unusual structures require From comparison of 2 options, Consultant chooses the option of Bailey for middle span because it is cheaper.

Tiu chun nghim thu: Thp c t b tng cn nng Hot rolled steel for If we buy it, we must transport km from factory to the site. Bridge area is 2247-98 by tidal regimes of sea and internal rain. Ph gia C chng ch k thut, c cc c quan qun l Nh nc cng nhn: No I 1 2 3 4 5 6 7 8 247–98 design standards and norms According to the standards framework approved by Ministry of Transport as Decision No. According to the Terms of Reference and other documents: TCVN hoc tng ng.

  MAHITICHA ADHIKAR PDF

Monthly average absolute humidity is presented in the table below. Design of concrete structures Concrete bridges: Use product of Co Khi 27-98 Giang factory, transport to the site by waterway with the distance is The distance between new bridge and the existing bridge is about 75m upstream direction to Tien Giang as Document No.

Thuyết minh thiết kế bản vẽ thi công cầu nhịp chính dạng dàn bailey nhịp dẫn dầm I18m tiếng anh

The physical-mechanical characteristics are as following: Fine aggregate Natural sand, manufactured sand, or combination: Those 22tcj in area of 03 provinces: Other norms and standards No.

Due to above characteristics, land is frequently swamped and. Tiu chun thit k: Ct liu mn Ct thin nhin, ct nghin hay kt hp: Nguyn tc chung 3.

Tien Giang and Hau Giang with dense system of canals, which serving for transportation and for irrigation, divided this area. Assembled at the site. We have a comparison for two options: Thp thanh trn trn.

Two piers of middle span are shape steel, the other piers are wood. Double bituminous surface treatment with 2 layers standard 3. Projects of 13 bridge is part of Component B – Phase I of project, aiming to upgrade and return the existing bridges crossing the Waterway Corridor No.